This pit shall be used to store semi-dried cuttings from the formation/well. The well will generate estimated over 1,300 m3 wet solids and we will have to blend this volume with new soil to maintain acceptable salinity levels. Therefore the volume could potentially at least doubled to 3,000 m3.