Chapter 3 Machine installation and debugging
1. hoisting
There are two sets of holes on the host body base, the sling through the lifting holes for lifting the host with (see Picture 3). Note: The crane lifting equipment shall not be less than 6000kg.
(Picture 3)
2. Installation (see Picture 4)
(Picture 4)