Then seen by inbox from OGE in Thai after visiting Pasquale seems that now everything is OK, no need to request or get more information, and you all know what the problem and what are the solutions, then be communicated to Sky Power when the person will making changes, or if you send instructions as required by Sky Power to do the work in them, to put an end to the problems and put all the 11 machines in the weaving conditions as supplied to OGE, altrimeti and only waste time, changing connecting rods, TAC, NRV and other, same thing for the one supplied to BJVP which is located in the same conditions.
The problem had to OGE is not tied to the machine but to change the parameters that did DJ. Besides, it has changed the connecting rod and the crosshead a few months ago but it was not bought from us.
The other machines should have no problems but we do an update improvement included close valves input / output when the compressor is stopped.