operators produce 100 pieces of products, which takes 7.5 hours together. The expected time to produce one piece is 30 minutes based on the sum of all process times on all machines. The total expected time is then 100 × 30 = 3,000 minutes. However, when we are able to produce 100 pieces in 3,150 minutes, then our team productivity is 3,000 ÷ 3,150 = 0.952 or 95.2%. Production is the volume of pieces of products (pcs) produced. When we produced 100 pieces, then our production is 100 pcs. Production plan is the expected volume of products that we need to make in a specified period based on the customer orders or forecasts. The customer has ordered for tomorrow 110 pieces, thus our production plan for tomorrow is 110 pcs.