As Bangkok’s soil is generally soft clay up to about
30m depth, it was necessary to transfer the loads to
this level with 16 numbers 800mm span piles
through a pilecap of 2.3m thick. In areas where
driving spun piles were not possible, especially at
the location of existing bridges at Bangpakong river
bored piles were used.