*This could mean that the system
could not detect an increase in
reservoir temperature when it was
supposed to be heating
*The system detected a rise in
temperature when the reservoir
was supposed to be cooling
*The reservoir could not reach the
set point temperature in the
allotted time
*The reservoir temperature could
not be maintained within