Moreover, the results of the site survey showed that the suitable areas – Killom, Monlan, and Maehae – were ready to install wind farms with capacities of 1 MW and 3 MW (total capacities of 9 MW and 27 MW), which can produce approximately 18.7 and 44.9 GWh/yr of electricity, respectively.