Inside the APCB plant, official have move to machine to safe area on the 1st floor. From checking the CVS machine we found all part of machine a lot of carbon deposit outside and inside. After clean all part the machine can turn on but have the four components are damage and loss such as mouse, keyboard, UPS and Inner solution (in the picture). And the machine need to calibrate. After calibrate the machine are ready to used.