Please make sure there are no additional charges levied for the below delivery as the request for the small lot was requested 2 weeks back (04/10/2016) by Mr. Ricky .
Mr. Pandian is also looking for Hi Tech data centres (WO: 2309) stair tread material which is due on 22nd October, so assist to add the Aurora’s (2297) 2 stair treads along with 2309’s materials and deliver it as scheduled.