The compound was filled with carbon black in a two-roll mill (FEF 550, 30 phr), formulated with dicumylperoxide (1 phr) and cured at 160 -C/20 min, followed by a post-curing cycle of 150-C/72 h. Sifeli and FVMQ were standard seal materials compounds available on the market (formulation details unknown)