The Electrocomp Corporation manufactures two electrical products:
air conditioners and large fans The assembly process for each
is similar in that both require a certain amount of wiring,
drilling, and assembly. Each air conditioner takes 3 hours
of wiring, 2 hours of drilling, and 1.5 hours of assembly
Each fan must go through 2 hours of wiring, 1 hour of drilling,
and 0.5 hours of assembly. During the next production period,
240 hours of wiring time, 140 hours of drilling time, and 100
hours of assembly time are available. Each air conditioner sold
yields a profit of $25. Each fan assembled can be sold for a $15
profit. Formulate and solve Electrocomp's problem to find the best
combination of air conditioners and fans that yields the highest profit.