The equipment efficiency shall reach 95% (including 95%) of the maximum production efficiency.
If only due to Seller' s reasons, every 1% lower than 95% the Seller will pay the buyer penalty
1% of the total contract value. A period of two months will be given to seller for adjustment if the
max, efficiency of 95% cannolbe reached during test. The time of two months will begin from the
date of the finarisation of the first efficiency test. Ir for the second tests, the seller' s still fail to
reach 95% the buyer can claim against the seller in accordance with clause 16 of the
contrat