29.1.1 Before the work is commenced, the awarded bidder or contractor must prepare at his own expenses, from relevant and referenced specifications and drawings, working drawing for the locomotive construction showing in detail all material, and equipment to be furnished and their arrangement, which are to be submitted for the acknowledgment of the SRT and/or its Inspecting Engineer