Delivery Rating – Production and/or Service (+100 to -250
Points)
Delivery Rating General Rules
• Determined separately for Production and Service
• Requires at least two months of delivery ratings to gain points
• Delivery ratings are issued to Ship Points
• A unique ship point is determined by ship point GSDB code
• Production Sites uniquely supplying bulk material, "As Required"
parts/product may be exempt from Delivery requirements including
MMOG/LE IF they are marked as waived in SIM by an MP&L
analyst.
Delivery Ratings Considered in Q1
• All delivery ratings assigned directly to a manufacturing Supplier
Site are considered (where Mfg Site code = ship point Site code)
• Delivery ratings for ship points associated with a manufacturing
Supplier Site are only considered when receipts exist through the
ship point within the last 7 months (including the immature month).
• When no receipts exist in the last 7 months, the message "Not used
in Q1 score, zero receipts in last 7 months" will appear by these
ratings.
Determining Worst Ship Point
• For all considered ship points (and the directly shipping
manufacturing site as appropriate), the Supplier Site receives a
-250 point adjustment if the 6 month weighted average AND the last
three available delivery ratings within the last 7 calendar months all
fall below 81.
• If no ship point meets the -250 point adjustment criteria above, then the
ship point with the worst 6 month weighted average is used to
determine the Q1 points based on the following scoring table:
Delivery Adjustments where no ship point meets the -250