Is there a procedure for resolving incomplete or conflicting requirements with those responsible for defining the requirements?
Are design outputs documented and expressed in terms of requirements, calculations and analyses?
Are there quantifiable measurements defined for phase exit/entry criteria?
Have the above criteria been verified and confirmed with documented data/reports and acceptable results?
Has the design verification been planned, established, documented and assigned to competent verification personnel?