The floor painting work is done last night. However, to make the paint getting more set up with the floor, we shall leave half of shop area in unavailable zone (you will see barrier tape on it). You can work as normal on another half at the tool rack side.
Please use the floor softly today. The shop floor will be back to normal on next Monday. Please note that the walk way is available to use now.