New Single Lane air track air boot from Proline supplied Vacuum discharge to
Vertical position onto Single lane Vacuum Elevator, Transfering cans to high
Level , Side transfer from Vacuum Elevator onto 678mm wide Mass
Mechanical conveying into Existing Palletiser infeed Conveying.