Motor Pump. 5020-PM-001A (H)
1.1 Off-Line Shutdown Inspections/ PM: Clean Motor if needed, if motor is critical do a winding test
1.2 On-The-Run PM: If the bearings are supposed to be greased, grease them.
1.3 On-The-Run Inspection: Air Intake. Temperature. Noise, Vibration. Bolts. Base. Foundation. Electrical. Detailed Cleaning.
1.4 Vibration: Vibration analysis