Vehicles for sampling were selected at random during each day of the one-week sampling period, as to
be representative of the waste stream. According
ASTM D5231-92, for a weekly sampling period of k
days, the number of vehicles sampled each day should
be approximately n/k, where n is the total number of
vehicle loads to be selected for the determination of
waste composition. A weekly period is defined as 5
days.