The reception area under the extraction conveyor is the second problematic point of the structure. Pieces of scrap iron and non-ferrous elements which are not hooked with anything, heap up on the floor, generating a pile, which is difficult to separate. Moreover, when the operator removes jams at the beginning of the extraction process, the pile becomes inextricable.