High settlement will occur with the structure above soft soil because of long time consolidation. Stability issue is another problem affecting the construction such as embankment and excavation which would be essential to improved soil quality before construction. Soft clay used in this research is obtained at depth about 8-10m from the surface at Ma Hai Sa Wan Junction Bangkok that show in Fig. 2.1