2016 - Present Draftmen, Detailed Design of Commuter Train Station for Dark Red Line Project, State Railway of Thailand
2015 - Present Draftmen, Detailed Design of Don Mueang Station for Airport Rail Link Extension Project
2015 Draftmen, Detailed Design of an Overpass along Chonburi Rural Road No. 3009 over Motorway (Highway No. 7). A balanced cantilever bridge with 94 m main span in Chonburi province.
2015 Draftmen, Detailed Design of an Interchange between Highway No. 41 and No. 417. The design included two pre-casted segmental bridges in Surat Thani province.
2015 Draftmen, Detailed Design of an Overpass along Prachuab Kirikhan Rural Road No. 2057 over Highway No. 37. A pre-casted segmental bridge in Prachuab Kirikhan province.
2015 Draftmen, Detailed Design of an Overpass along Chainart Rural Road No. 1014 over Highway No. 32. A pre-casted segmental bridge in Chainart province.
2015 Draftmen, Detailed Design of Chulalongkorn 100 Years Anniversary Parking and Exhibition Building Project.
2014-2015 Draftmen, Preliminary Design and Preparing Tender Document for Bangkok Monorail Grey Line Project
2014 Draftmen, Detailed Design of Bridges along New Rural road line in Nakorn Sri Thammarat. There are 4 small bridges and an overpass over southern railway line. The overpass is a pre-casted segmental bridge.
2013 Draftmen, Feasibility Study for Ha Long – Mong Cai Expressway Project, Vietnam. Responsible for drafting work of bridge structures along the expressay route with total length of 135 km.
2016 - Present Draftmen, Detailed Design of Commuter Train Station for Dark Red Line Project, State Railway of Thailand2015 - Present Draftmen, Detailed Design of Don Mueang Station for Airport Rail Link Extension Project2015 Draftmen, Detailed Design of an Overpass along Chonburi Rural Road No. 3009 over Motorway (Highway No. 7). A balanced cantilever bridge with 94 m main span in Chonburi province.2015 Draftmen, Detailed Design of an Interchange between Highway No. 41 and No. 417. The design included two pre-casted segmental bridges in Surat Thani province.2015 Draftmen, Detailed Design of an Overpass along Prachuab Kirikhan Rural Road No. 2057 over Highway No. 37. A pre-casted segmental bridge in Prachuab Kirikhan province.2015 Draftmen, Detailed Design of an Overpass along Chainart Rural Road No. 1014 over Highway No. 32. A pre-casted segmental bridge in Chainart province.2015 Draftmen, Detailed Design of Chulalongkorn 100 Years Anniversary Parking and Exhibition Building Project.2014-2015 Draftmen, Preliminary Design and Preparing Tender Document for Bangkok Monorail Grey Line Project2014 Draftmen, Detailed Design of Bridges along New Rural road line in Nakorn Sri Thammarat. There are 4 small bridges and an overpass over southern railway line. The overpass is a pre-casted segmental bridge. 2013 Draftmen, Feasibility Study for Ha Long – Mong Cai Expressway Project, Vietnam. Responsible for drafting work of bridge structures along the expressay route with total length of 135 km.
การแปล กรุณารอสักครู่..

2016 - ปัจจุบัน Draftmen, ออกแบบรายละเอียดสถานีรถไฟพร็อพสำหรับมืดโครงการสายสีแดง, การรถไฟแห่งประเทศไทย2015 - ปัจจุบัน Draftmen, ออกแบบรายละเอียดสถานีดอนเมืองแอร์พอร์ตลิงค์โครงการขยาย2015 Draftmen, ออกแบบรายละเอียดของสะพานลอยพร้อมชลบุรีถนนชนบท ฉบับที่ 3009 มากกว่ามอเตอร์เวย์ (ทางหลวงหมายเลข 7) สะพานคานสมดุลกับ 94 เมตรช่วงหลักในจังหวัดชลบุรี. 2015 Draftmen, ออกแบบรายละเอียดของการแลกเปลี่ยนระหว่างทางหลวงหมายเลข 41 และฉบับที่ 417. การออกแบบรวมถึงสองก่อนหล่อสะพานปล้องในจังหวัดสุราษฏร์ธานี. 2015 Draftmen, ออกแบบรายละเอียด ของสะพานลอยพร้อมประจวบคีรีขันธ์ชนบทถนนหมายเลข 2057 เหนือทางหลวงหมายเลข 37 สะพานก่อนหล่อปล้องในจังหวัดประจวบคีรีขันธ์. 2015 Draftmen, ออกแบบรายละเอียดของสะพานลอยพร้อมชัยนาทชนบทถนนหมายเลข 1014 เหนือทางหลวงหมายเลข 32 สะพานปล้องก่อนหล่อในจังหวัดชัยนาท. 2015 Draftmen, ออกแบบรายละเอียดจุฬาลงกรณ์ครบรอบ 100 ปีที่จอดรถและการแสดงนิทรรศการโครงการอาคาร. 2014-2015 Draftmen ออกแบบเบื้องต้นและการจัดเตรียมคำเสนอซื้อหลักทรัพย์กรุงเทพรางโครงการรถไฟฟ้าสายสีเทา2014 Draftmen, ออกแบบรายละเอียดพร้อมสะพาน ถนนสายชนบทใหม่ในจังหวัดนครศรีธรรมราช มี 4 ขนาดเล็กที่มีสะพานและสะพานลอยข้ามเส้นรถไฟภาคใต้ สะพานลอยเป็นสะพานปล้องก่อนหล่อ. 2013 Draftmen ศึกษาความเป็นไปได้สำหรับฮาลอง - Mong Cai โครงการทางพิเศษเวียดนาม รับผิดชอบในการจัดทำร่างการทำงานของโครงสร้างสะพานตามเส้นทาง expressay ที่มีความยาวรวมทั้งสิ้น 135 กิโลเมตร
การแปล กรุณารอสักครู่..
