are 3.02 kWth/kWe and 1.39 kWth/kWe, respectively, with the water temperatures entering and leaving of the VCHP system as 49.60°C and
48.61°C, respectively. Economic evaluation is also carried out with
15 sets of drying per month, 24 hours per drying set. At the time of assessment with the construction budget of about 20,000 USD, the payback period is 13 months.
are 3.02 kWth/kWe and 1.39 kWth/kWe, respectively, with the water temperatures entering and leaving of the VCHP system as 49.60°C and48.61°C, respectively. Economic evaluation is also carried out with15 sets of drying per month, 24 hours per drying set. At the time of assessment with the construction budget of about 20,000 USD, the payback period is 13 months.
การแปล กรุณารอสักครู่..
