3.1 Planning of construction waste management
- Temporary lay out for construction waste control is specified in the plan
- The person in charge for controlling overall environmental activities are defined
- Any plan to deal with the hazardous material such asbestos and gypsum board, identified in the plan
- Any site target for reducing and recycle of waste material? If so, Do the plan for reducing and recycle of waste material are well prepared
3.2 Condition of waste reduction (If available)
- The waste reduce measure as a plan, is it strictly follow up? Such reduce package, reduce incomming material or improve work technique.
- Please show the record of waste reduction, status and target.
3.3 Condition of recycle of waste (If available)
- The recycle measure as a plan, is it strictly follow up?
- Please show amount of recycle material is measure include the sending out volume
3.4 Construction waste treatment
-The waste collecting and classifying area is well prepared?
- Waste material that could deteriorate and cause to a problem of classification is well protected from rain
- At the waste stock yard, it is explicitly show type, person in charge and contact address of waste
- Waste treatment supplier have an enough capability for treat a specific waste from site
- The waste manifest record is properly kept at site, for HM waste.
- Do the waste management system compliance to the related laws? (*)
3.1 Planning of construction waste management
- Temporary lay out for construction waste control is specified in the plan
- The person in charge for controlling overall environmental activities are defined
- Any plan to deal with the hazardous material such asbestos and gypsum board, identified in the plan
- Any site target for reducing and recycle of waste material? If so, Do the plan for reducing and recycle of waste material are well prepared
3.2 Condition of waste reduction (If available)
- The waste reduce measure as a plan, is it strictly follow up? Such reduce package, reduce incomming material or improve work technique.
- Please show the record of waste reduction, status and target.
3.3 Condition of recycle of waste (If available)
- The recycle measure as a plan, is it strictly follow up?
- Please show amount of recycle material is measure include the sending out volume
3.4 Construction waste treatment
-The waste collecting and classifying area is well prepared?
- Waste material that could deteriorate and cause to a problem of classification is well protected from rain
- At the waste stock yard, it is explicitly show type, person in charge and contact address of waste
- Waste treatment supplier have an enough capability for treat a specific waste from site
- The waste manifest record is properly kept at site, for HM waste.
- Do the waste management system compliance to the related laws? (*)