The Primary function of a TRM is to provide a permanent (root or stem) reinforcement for the mature vegetation during hydraulic flow events where velocities and sheer stresses exceed the limits of mature, natural vegetation. A secondard=y and more temporary functin is to collect sediment during the hydraulic flows prior to and while vegetation is being established. The TRM performance increases as the vegetation becomes established and the root structure is entangled within the synthetic mat.