A further effect is associated with the moisture content of the tunnel air. On a warm summer’s day this could amount to about 10 kg of water and during the cooling process this moisture would be deposited, mostly on the cooler fins, where it would eventually freeze, blocking the passages and reducing heat transfer. To deal with this problem, it is necessary to include a dehumidifier to supply dried air to the tunnel circuit