As shown in Fig. 2, the geothermal storage tank must be installed 3 m above the ground to acquire a high-temperature heat source and pressure difference needed to feed the high steam tempera- ture geothermal water through the CPVC4120 pipe to the machine As shown in Fig. 2, the geothermal storage tank must be installed 3 m above the ground to acquire a high-temperature heat source and pressure difference needed to feed the high steam tempera- ture geothermal water through the CPVC4120 pipe to the machine must be drained from the tank. The daily drainage of the geothermal
water is approximately 200 M3.