As shown in Fig. 2, the voltage rise situation would take place when the net injection is at the 4th quadrant. The storage device will reduce the net active power injection to a lower level so that the operating point becomes closer to the negative Q axis in the 4th quadrant as shown in Fig. 3(a) and (b).