Can you please sent us the planning of the building of the pontoons and the assembly, if possible with some pictures of the current status? We can sent an engineer for supervision, but would like to know when he is needed, for how long and with which capabilities.
Regarding point 1 of your e-mail below; I checked and unfortunately the manuals are not sent with lot 3. We will sent them with the spare parts.
Regarding point 2 of your e-mail below; yes the DTPS/DGPS system is already installed in the operator cabin
Kind regards,