For
example, for a lot that is 20 percent defective a sample size of 6 (curve E) will accept such lot 65
percent of the time; whereas a sample size of 48 (curve L) will accept the same lot 22 percent of
the time. In this example the ratio between probabilities of acceptance is only 3 to 1.