A car hits a tree at an estimated speed of 25 mph on a 3% upgrade. If skid marks of 120 ft. are observed on a dry pavement (f = 0.35)followed by 250 ft (F = 0.25) on a grassy –stabilized shoulder, estimate the initial speed of the vehicle just before the pavement skid began.