1. factory installed brush weather seal
2. factory installed neoprene weather seal
3. energy guard perimeter weather seal system
4. 18" Lip
5. 20" Lip
6. steel NEMA 12 Control Panel(Interlock capable)
7. Dock-Guard barrier lip
8. 24" Pit conversion
9. Spray foam insulated deck
10. Galvanized finish (deck ,Lip & Subframe Only)
11. Lip taper
12. special paint color
13. high Lip cown
14. box option: For installation without pre-formed concrete pits, dock leveler
supplied with integral pre-formed steel box for pour-in-place construction. Leveler shall be in an enclosed steel box structure complete with its own six-piece, welded structural curb angles and concrete anchors.The leveler is to be concreted in place as the floor is poured