Due PISA proceed protection level at 10th floor and found that the concrete curb level are wrong from agreed level at +57.00. PISA installed the steel bracket and found that the level are higher than the level in shop drawing, it’s 80 mm. and some lower 60 mm. We are pleased kindly request to ITD revise the curb level.