It is quite important to analyze the
steady-state frequency deviation, tie-flow deviation
and generator outputs for an interconnected area after
a load change occurs. Let there be a load change ∆PL
in area 1. In the steady state after all synchronizing
oscillations have damped out, the frequency will be
constant and equal to the same value on both areas