an for example be desirable when a future timetable unknown.
For long term capacity planning, microscopic simulation may represent a level of
detail that is not necessary. The macroscopic infrastructure model and the possibility to
generate timetables save a lot of time when the simulations are prepared, compared to if a
microscopic simulation tool is used. Instead, this time can be spent on improving the
analysis in other aspects, e.g. including more scenarios