Description of the procedure
The CS2 controls the capability of the production process by: Implementation of inspection at the end of production line by Quality Gate or indentified Quality stations (production Stations):
100% check on all produced vehicles on specified quality criteria’s
100% check on Job card (2nd hand stamping process – DS relevant)
Monitoring daily feedback loop with other sensors, e.g. PA (CS3), CPA1 (CS4), Campaign Management
Escalation check (dynamic check of defined quality criteria) on 100% of the defined vehicles for a defined time period (according escalation plan)
Random check on defined checking criteria’s