The document details comprises a several systems and components such as Chamber, Condenser, Refrigeration system, Vacuum System, SIP/CIP System and etc. The overall qualification of the equipment is required to comply with the GMP requirements and performed by Tofflon® (the equipment manufacturer) and Biolab Co., Ltd. (the user). This protocol is intended for Performance Qualification (PQ) of the equipment.