Operation Procedures
Energize and De-energize the Active Harmonics Filter
Note: The AccuSine SWP must be energized for the first time by qualified Schneider Electric personnel who will carry out the necessary checks to make sure that operation of the installation is optimum. To enable the AccuSine SWP to operate, remove the short-circuit from the current sensor’s secondary windings by moving the strap X1 on the CCTY card from the MAINT position to the NORMAL position.