The Operator intends to change the structural gauge in a form that at least design specifications of the TSI can be met. The manufacturer shall point out, which changes shall be considered and support SRTET to upgrade the System accordingly. เก addition the manufacturer shall propose an adaptation of the existing fleet with respect to the platform gap and stepping distance and quote separately.