At day 6 thirty representative fruit/treatment (n = 30) were sampled to measure pulp/peel ratio (B). The vertical bars indicate the standard error. Mean values that have different letter in (B) are significantly different at P 0.05.
At day 6 thirty representative fruit/treatment (n = 30) were sampled to measure pulp/peelratio (B). The vertical bars indicate the standard error. Mean values that have different letter in (B) are significantly different at P 0.05.