Installed in the reservoir fluid hydrocarbons 4 atoms (C4) and existing hydrocarbon 5 atoms (C5) with retention of more than 5 cubic meters or more (tank hydrocarbon four atoms, the project plans to use future it uses chemical groups such as Volatile Oil hydrocarbon 5 atoms (C5) hydrocarbon 9 atoms (C9), which remained attached to the sprinkler heads are designed to force people (Manual Operation).