The second facet is the provision of information and guidance. This provision is necessary to aid the operator to restore the process to normal. Or, if that is not possible,the operator can guide the movement of the process to a safer place to provide adequate time to manage the situation later. Information and guidance, provided by the infrastructure, is then used by the operator to obtain a better understanding of the problem.