The limestone is carried about 100 miles by river to the plant. Since transport on the inland waterways is costly, consideration is being given to a road which will eliminate about two-thirds of the inland water transport between the quarry and the cement plant (see figure 4-1) This part of the river is navigable for only six months fo the year, while the river from the water head to the cement plant is navigable the entire year.