Sampling was conducted during hot (December 2013 to
February 2014) and cold days (July to September 2014, except for
S2 and S3 sites, for which data only for the warm period could be
collected due to technical problems with the sampling equipment).
Measurements were made at a height of 1 m above the ground
level along the highways.