Comletion of preliminary design. The PM should prepare a prelliminary design cost estimate based on measurement of approximate or parameter quantities from the designer's preliminary design stbmittal. As the mechanical and elecrical designs typically lag behind the civil archilectual and structural designs preliminary design estimates often contrain approximate quantities for the architectural structural and civil works and parameter quantities for the mechanical and electrical components.