As ITD demolished tower crane sine 17th October 2014 for proceed to finish of roof construction on 30 November 2014 but still have Derrick Crane size 25 meter can use until 30 November 2014 as reference 1.
PISA construction works that production delay still load and uploads materials. Therefore, we are pleased request PISA to accelerate prepare material for installation according to demolish ITD’s Derrick crane as above.