Regarding LKU-ZD11 well results show 3 m TVD of oil in LKU K in Z6.3 Block and water bearing shalely sand in LKU L in Z6 block which is the main target of LKU-ZD10.
Therefore, team would like to have more time to reconsider well position of LKU-ZD10 which will be drilled next well.
So team would like to change drilling sequence from ZD11 – ZD10 – ZD12 – ZD14 – ZD13 to ZD11 – ZD12 – ZD14 – ZD13 – ZD10. (move ZD10 to be drilled last well)