I will have the markups of the overall draft system schematics ready for you by tomorrow. I think if we just do initial system at startup and our preferred solution at A3 size that will be enough. The PFDs may take me a bit longer to prepare as I need to make a start on the Interim Report.
I have attached a file copy of what we did in 2008 for the previous Study that we can alter/improve for this study project. Let me know if any problem. I assume you are in tomorrow??