Krisana have been talking with me when began of operation. He asking request to install DVR in rack cabinet. So all rack cabinet are used to power backup from a generator if power from PEA failure occurs. That is means CCTV use power from the outlet (PDU) in rack cabinet and cover to back up power too.
On December 29,2015 Krisana call to me and request CCTV, plug outlet and lighting need used power circuit is don’t have generator backup if power outage.
I have answered to Krisana that I would like to asked and consult the management first, because I thought it was not make sense if the power outage, then it CCTV it stopped working too. And where can you find the power source plug to CCTV system? I saw that in a single electrical line has been calculated for lighting and plug already. Why I can use electricity from the same source. In the meeting it we was mentioned that cover the all electrical system in the server room (Lighting & Plug)
For air condition at the office zone is added later, but it is more changes before starting the operation. And don’t have any concern about power from Aware. When your team came to install air conditioner at office zone your staff was selected power source to air conditioner by themselves. Until the installation has finished completed. Krisana have requested to change to power source. I must inform to management know first.