The modeling performed for the floodplain water bodies contaminated by N compounds shows that during
large magnitude floods washout occurs. The washout process consists of two stages: an initial rapid
stage lasting about two hours during which the upper (3–4 m thick) layer is washed out, followed by a
second stage when the concentration of NH4-N in the floodplain water body remains nearly constant.